§ 21-129. Pavement construction schedule.  


Latest version.
  • The bituminous concrete surface on all streets shall not be constructed until ordered by the superintendent of public works and the city engineer. If the volume of construction on private property warrants it, the roadway base shall receive two (2) coats of hot liquid asphalt and sand as specified in this article to provide a temporary wearing surface until such time as the permanent surface is feasible.

(Code 1960, § 49-3.14; Ord. of 2-3-70)